News

 

The News from 2008

Washington D.C.- 15 November 2008 HA Design Group completed the VOA Control Room 49 Renovation. .....More

Alexandria,Va. 13 November 2008; HADesign Group completes the Phase A of PBS's Next Generation Interconnect System.

Washington D.C. - 15 September 2008 HA Design Group was awarded the contract for Project Management, Design, and Installation of the Camera/Camera Control System for VOA TV. This system encompasses over 40 cameras in at least 3 geographical locations. .....More

Washington D.C. - 15 August 2008 HA Design was awarded the contract to Project Management, Design, and Build the Remote Studio for the LA Bureau of the Voice of America. .......More